91免费高清无砖码区,国产精品麻豆,图片区网友自拍另类图区,日韩a一级欧美一级在线播放,69av视频在线,国产一二三区在线观看,欧美日韩国产专区

當(dāng)前位置:首頁(yè)-新聞中心新聞中心

風(fēng)管制作作業(yè)都有哪幾個(gè)要求?

發(fā)布人:http://m.ryublack.com   發(fā)布時(shí)間:2024-06-18 19:07:36


  1、風(fēng)管預(yù)制應(yīng)有獨(dú)立的工作場(chǎng)地,場(chǎng)地應(yīng)平整、清潔,加工平臺(tái)應(yīng)找平。雙面鋁箔絕熱板風(fēng)管等其它復(fù)合材料風(fēng)管的場(chǎng)地應(yīng)干燥,應(yīng)有足夠的成品堆放場(chǎng)地;

  1. The prefabrication of air ducts should have an independent work site, which should be flat and clean, and the processing platform should be leveled. The site for double-sided aluminum foil insulation board air ducts and other composite material air ducts should be dry and have sufficient storage space for finished products;

  2、作業(yè)地點(diǎn)應(yīng)有安放施工機(jī)具和材料堆放場(chǎng)地,設(shè)施和電源應(yīng)有可靠的防護(hù)裝置。作業(yè)場(chǎng)地道路應(yīng)暢通。必須有能滿足消防要求的各種器械及設(shè)施;

  2. The work site should be equipped with construction equipment and material storage areas, and facilities and power sources should have reliable safety protection devices. The roads at the work site should be unobstructed. There must be various instruments and facilities that can meet the fire protection requirements;

  3、加工設(shè)備布置在建筑物內(nèi)時(shí),應(yīng)考慮建筑物樓板、梁的承載能力,必要時(shí)應(yīng)采取相應(yīng)措施;

  3. When arranging processing equipment inside buildings, the bearing capacity of building floors and beams should be considered, and corresponding measures should be taken if necessary;

  4、大樣圖、系統(tǒng)圖經(jīng)審查符合要求,并進(jìn)行了技術(shù)及交底;

  4. The detailed drawings and system diagrams have been reviewed and meet the requirements, and technical and safety briefings have been conducted;

  5、對(duì)于潔凈系統(tǒng)的風(fēng)管制作應(yīng)有干凈封閉庫(kù)房?jī)?chǔ)存成品或半成品;

  5. For the production of air ducts in clean systems, there should be a clean and enclosed warehouse for storing finished or semi-finished products;

20180522118440.jpg

  6、加工場(chǎng)地應(yīng)預(yù)留現(xiàn)場(chǎng)材料、成品以及半成品的運(yùn)輸通道,加工場(chǎng)地的選擇不得阻礙消防通道。

  6. The processing site should reserve transportation channels for on-site materials, finished products, and semi-finished products, and the selection of the processing site should not obstruct fire exits.

  以上是關(guān)于 濟(jì)南風(fēng)管加工廠 的介紹,若想了解相關(guān)知識(shí)可請(qǐng)點(diǎn)擊:http://m.ryublack.com我們將會(huì)全心全意為您提供滿分服務(wù),歡迎您的來(lái)電!

  The above is an introduction to Jinan Wind Pipe Processing Factory. If you want to learn more about related knowledge, please click: http://m.ryublack.com We will wholeheartedly provide you with full score service. Welcome to call us!

上一篇:螺旋風(fēng)管在建筑通風(fēng)領(lǐng)域的應(yīng)用日益廣泛:靜音、
下一篇:通風(fēng)管道:計(jì)算通風(fēng)管道的規(guī)則

網(wǎng)站首頁(yè) 關(guān)于我們 產(chǎn)品展示 新聞中心 工程案例 在線留言 聯(lián)系我們

巴彦淖尔市| 岑溪市| 万年县| 全椒县| 泊头市| 泽库县| 清丰县| 渭源县| 秦皇岛市| 昌乐县| 洛川县| 宜州市| 大同县| 平谷区| 确山县| 财经| 来凤县| 堆龙德庆县| 紫金县| 甘孜县| 莒南县| 额济纳旗| 临清市| 武乡县| 蛟河市| 通城县| 梁河县| 乐山市| 和平区| 开鲁县| 辽阳县| 通州区| 都昌县| 广汉市| 商都县| 乌鲁木齐县| 东丰县| 东乡族自治县| 翁牛特旗| 固始县| 金乡县|